MAJOR UPGRADE AT RASMUSSEN FUEL SITE

Fuel Station Upgrade-Rasmussen
Fuel Station Upgrade-Rasmussen

MAJOR UPGRADE AT RASMUSSEN FUEL SITE

TOWNSVILLE

KEY INFORMATION

CLIENT: cHEVRON

LOCATION: TOWNSVILLE

SERVICE: MAJOR UPGRADE

PROJECT MANAGER: MATT LOGAN

PROJECT OVERVIEW

 Nqpetro recently completed a comprehensive upgrade at a fuel station in Rasmussen, QLD, bringing it up to global Underground Storage Tank System (USTS) standards. Led by our dedicated project manager, Matt Logan, this fuel management solution aimed to mitigate environmental and operational risks by transforming the site’s existing single-wall steel tanks into double-wall, relined tanks with an interstitial space for enhanced integrity monitoring.

KEY PROJECT HIGHLIGHTS

Full internal clean and double-wall relining of all tanks

Demolition work and installation of new concrete pavements

Complete replacement of fuel pipelines

Replacement of pumps with updated power and communication systems

Installation of Automatic Tank Gauging (ATG)

Site calibrations and commissioning

Line marking and painting across the site

All Permit Writing where required

Safety at the Forefront

With confined space entry identified as a high-risk task, Nqpetro collaborated closely with our HSSE team. Together, we implemented comprehensive safety measures, including dedicated spotters, certified entry/exit equipment, and rehearsed rescue plans. This proactive planning ensured the project ran smoothly and safely, with zero incidents.

A Team Effort

Special recognition goes to our Site Supervisor, Peter Blackburn, and Skilled Installer, Chris Bell, who executed each stage of the upgrade with precision and dedication. Their hard work and commitment to quality and safety were instrumental in bringing this project to completion. 

This upgrade stands as a testament to Nqpetro’s dedication to excellence in fuel management solutions.Stay tuned for more project highlights as we continue delivering compliant, efficient fuel station upgrades and fuel management solutions across Australia.

 

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100

DELIVERING EXCELLENCE AT NIGHTOWL CAIRNS

Fuel Station
Fuel Station

DELIVERING EXCELLENCE AT NIGHTOWL CAIRNS

CAIRNS

KEY INFORMATION

CLIENT: NIGHT OWL

LOCATION: CAIRNS

SERVICE: NEW GREENFIELD SITE

PROJECT dIRECTOR: ALEX PLOWMAN

PROJECT OVERVIEW

Nqpetro is proud to announce the successful completion of the NightOwl Cairns project, a new greenfield site that marks another significant achievement for our team. Led by Project Director Alex Plowman, this endeavour involved overcoming several challenges to deliver a fully operational site that meets the highest industry standards.

KEY PROJECT HIGHLIGHTS

Deep Excavation Management: Given the natural high groundwater table at the site, we implemented an engineered sheet piling and dewatering system to ensure safe and effective deep excavations.

Fuel Storage Installation: Our team handled the supply, excavation, installation, and backfilling of underground fuel storage tanks, ensuring they are securely in place and operational.

Spill Containment Systems: We installed a comprehensive forecourt spill containment system, crucial for maintaining safety and environmental compliance.

Fuel and Electrical Systems: We ensured safety and compliance by supplying and installing the hazardous area electrical system, designed to meet stringent safety standards and support seamless operations on site.

Fuel Equipment Fit-Out: fully equipped with the latest fuel dispensers and related equipment, ready to serve its purpose efficiently.

System Commissioning: We completed the project by commissioning the entire fuel and ATG systems, ensuring everything is fully functional and ready for use.

PROJECT DELIVERY

The successful completion of this project is a testament to our team’s expertise, commitment, and ability to deliver on time and within budget.

If you have a project that requires the expertise of a trusted industry leader, contact Nqpetro today. 

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100

Navigating Challenges in Brisbane’s CBD: Generator Fuelling systems

Generator Fuelling System
Generator Fuelling System

NAVIGATING CHALLENGES IN BRISBANE'S CBD:
GENERATOR FUELLING SYSTEMS

BRISBANE CBD

KEY INFORMATION

CLIENT: IRIDIUM PROJECTS

LOCATION: BRISBANE

SERVICE: GENERATOR FUELLING SYSTEM

DURATION: 10 DAYS

PROJECT MANAGER: JASON MARCH

PROJECT OVERVIEW

Upgrading a generator fuelling system is never a simple task, but when the project is located in the heart of Brisbane's CBD, it adds an extra layer of complexity. At Nqpetro, we recently undertook the replacement of an underground diesel tank for a new generator system in Brisbane City—a project that tested our team's ability to manage tight spaces, limited access, and precise scheduling.

Meeting the Challenge Head-On

Working within the Brisbane CBD posed significant challenges. The tight space in the loading dock where the tank was located required meticulous planning and coordination with multiple trades. Limited parking and access further complicated the logistics, making contractor management crucial to keeping the project on schedule. Additionally, the existing fittings were old copper, requiring the expertise of specialist plumbers to integrate the new pipework. Height restrictions in the area also required the use of a specialised small crane to position the new tank correctly.

Project Deliverables

Onsite inspection and pumping out of 5000L of oily water.

Surveying the site before cutting concrete.

Excavation of the tank area, removal of the old tank, and pipework.

Safe disposal of the old tank and preparation of the site for the new installation.

Installation of new anchors, the new tank, and connection of all pipework and electrical ATG system.

Pre-burial testing.

Backfilling of the tank farm and laying of new concrete.

Final site cleanup and demobilisation.

PROJECT DELIVERY

Despite the challenges, our team successfully completed the project, ensuring the new diesel tank was installed to the highest standards. At Nqpetro, we thrive on overcoming challenges, and this project is a testament to our team’s dedication and expertise in generator fuelling systems. Whether in a bustling city centre or a remote location, Nqpetro delivers quality solutions that meet our clients’ needs. 

For more information on our services or to discuss your project requirements, feel free to contact us today.

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100

FUELLING SUCCESS IN KARAWATHA

FUELLING SUCCESS IN KARAWATHA

BRISBANE

KEY INFORMATION

CLIENT: NIGHT OWL

LOCATION: BRISBANE

SERVICE: NEW GREENFIELD SITE

DURATION: 7 MONTHS

PROJECT MANAGER: JASON MARCH

PROJECT OVERVIEW

We are thrilled to announce the successful completion of our latest project at the new greenfield site in Karawatha. This project, led by our dedicated Project Manager, Jason, exemplifies Nqpetro's commitment to delivering high-quality and efficient fuel systems. Over the past seven months, our team has worked diligently to ensure that every aspect of this complex project was executed with precision and excellence.

KEY PROJECT HIGHLIGHTS

Excavation, Installation, and Backfill of Underground Fuel Storage Tanks: Our expert team managed the excavation and installation of underground fuel storage tanks, ensuring they were securely placed and efficiently backfilled to provide a solid foundation for ongoing operations.

Supply and Installation of a Hazardous Area Electrical System: Safety is paramount in our projects. We implemented a hazardous area electrical system that meets all relevant safety standards, providing reliable power to the site's fuel systems while minimising risks.

Supply, installation, and fit-out of all fuel equipment, including dispensers

Commissioning of Complete Fuel and ATG Systems, Including Vapour Recovery Stage 2: We oversaw the commissioning of both the fuel and Automatic Tank Gauging (ATG) systems, ensuring they were fully operational. The inclusion of Vapour Recovery Stage 2 technology further enhances the site's environmental compliance by capturing fuel vapours during refuelling.

PROJECT DELIVERY

At Nqpetro, we take pride in our ability to manage and execute complex projects that meet our clients’ specific needs. The successful completion of the Karawatha project underscores our dedication to delivering reliable and efficient solutions that ensure seamless operations for our clients.

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100

Fuelling Success on the North East Link Project

FUELLING SUCCESS ON THE NORTH EAST LINK PROJECT

MELBOURNE

KEY INFORMATION

CLIENT: SPARK NEL

LOCATION: MELBOURNE

SERVICE: VARIOUS sELF-BUNDED TANKS

DURATION: ONGOING PROJECT

PROJECT MANAGER: aNTON wHITE

PROJECT OVERVIEW

At Nqpetro, our commitment to excellence is reflected in the enduring partnerships we've cultivated over the years. Among these valued collaborations is our work with Spark NEL on Melbourne's prestigious North East Link project. This infrastructure venture represents a key milestone in enhancing Melbourne's transport network, and we are proud to contribute our expertise to ensure its success.

Meeting the Challenge Head-On

Our journey with Spark NEL began with a unique challenge: the efficient refuelling of tunnelling vehicles and machinery within the constraints of an underground environment. These vehicles and machinery require constant refuelling to maintain uninterrupted operations, making it crucial to implement a reliable and safe solution. To address this, Nqpetro supplied a range of high-capacity refuelling tanks, specifically designed to meet the demands of this project. This included:

12 x Bloc 1,000L 12V self-bunded refuelling tanks: Perfectly suited for the tight spaces of underground environments, these tanks provide safe and efficient fuel storage with built-in bunding to prevent leaks and spills.

4 x Grande 12,000L 240V dispensing self-bunded bulk tanks: These large-capacity tanks ensure a steady supply of fuel, supporting both underground and aboveground operations. Their robust design and self-bunding feature guarantee maximum safety and reliability.

Advanced Fuel Management

Our tanks are equipped with SmartFill's Gen. 3 fuel management system, a cutting-edge solution for precise fuel tracking and management. This system offers advanced safety features, including automated reporting capabilities and real-time monitoring of fuel levels, ensuring that every drop of fuel is accounted for. The result is a seamless and efficient refuelling process that supports the continuous operation of critical machinery.

PROJECT DELIVERY

The North East Link project is just one example of how Nqpetro is making a difference in the infrastructure and fuel management sectors. We invite you to experience the difference that comes with partnering with an industry leader who is as committed to your success as you are. With a proven track record of delivering innovative and reliable solutions, Nqpetro is ready to support your next project.

Contact us today to learn more about how we can fuel your success.

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100

Transforming Lubrication Management with Innovation

TRANSFORMING LUBRICATION MANAGEMENT WITH INNOVATION

BRISBANE

KEY INFORMATION

CLIENT: EAST COAST LUBES

LOCATION: BRISBANE

SERVICE: VARIOUS LUBES

DURATION: 3 MONTHS

PROJECT MANAGER: DALE KNIGHT 

PROJECT OVERVIEW

Nqpetro partnered with East Coast Lubes to conceptualise, construct, and commission an advanced system designed to enhance the efficiency of lubricant handling at their workshop in Brisbane. This cutting-edge system, powered by an Ebsray MD212 gear pump, represents a leap forward in reliability and operational efficiency.

KEY PROJECT HIGHLIGHTS:

Advanced Features: Our solution integrates state-of-the-art features tailored for precision and durability:

•Gauges for vacuum/pressure monitoring
•Thermal relief mechanisms
•Calibrated metering
•Air elimination functionalities

Each component is meticulously crafted and seamlessly integrated to ensure optimal performance in even the most demanding environments.


EXPERT INSTALLATION AND COMMISSIONING: During the commissioning phase, our skilled technicians demonstrated their expertise by installing tank stands fabricated to dumpy-level measurements, ensuring precise tank levelling. A specialised TRAP breather vent was also installed to safeguard against atmospheric water and condensation, preserving lubricant integrity.

PERFORMANCE VALIDATION: Through extensive testing, our system achieved impressive operational metrics:

•Unloading speeds of 450 litres per minute (LPM)
•Loading speeds of 400 LPM

These results showcase the efficiency and reliability of our solution, confirming its capability to meet rigorous operational demands.

PROJECT DELIVERY

The successful completion of this project with East Coast Lubes exemplifies our commitment to pushing boundaries and delivering unmatched solutions. As we celebrate this milestone, we reaffirm our dedication to driving innovation and excellence, empowering businesses to thrive in today’s dynamic market.

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100

Major Upgrade at Shell Fuel Station in ACT

MAJOR UPGRADE AT SHELL FUEL STATION - ACT

ACT

KEY INFORMATION

CLIENT: VIVA PHILLIP

LOCATION: ACT

SERVICE: TANK DECOMMISSIONING & UPGRADE TO SERVICES

DURATION: 2.5 WEEKS 

PROJECT MANAGER: JOE DORINKO

Nqpetro is proud to announce the completion of another successful project in ACT, in collaboration with SwitchCo. This project marks a transformative upgrade in fuel management systems, demonstrating our commitment to excellence and innovation in the industry.

KEY PROJECT HIGHLIGHTS:

DECOMMISSIONING REDUNDANT TANK: Safely decommissioned an underground fuel tank to mitigate contamination risks.

UPGRADED FUEL LINES: Enhanced safety and compliance standards by upgrading existing fuel lines.

CONVERSION OF EXISTING TANK: Successfully converted an existing tank to store a different product, expanding operational capabilities.

PARTNER WITH NQPETRO

At Nqpetro, we are dedicated to advancing fuel management solutions Australia-wide. Whether you’re planning a new installation, upgrade, or maintenance of fuel systems, our expertise ensures top-tier innovation and reliability.

 Ready to elevate your fuel station operations? Contact us today to discuss how Nqpetro can contribute to your next project with cutting-edge solutions and unparalleled service.

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100

Taking Fuel Management to the Next Level with Nqpetro

TAKING FUEL MANAGEMENT TO THE NEXT LEVEL WITH NQPETRO

TAMWORTH

KEY INFORMATION

CLIENT: ROLLER’S AUSTRALIA

LOCATION: TAMWORTH

SERVICE: TANK MANUFACTURE AND ONSITE COMMISSIONING

DURATION: 6 WEEKS 

PROJECT MANAGER: CARTER WRIGHT

In a recent project, Nqpetro has showcased its expertise by commissioning a G12 FES Tank with an advanced dispensing solution. This installation is a testament to our commitment to integrating cutting-edge technology with practical functionality, ensuring our clients have unparalleled control over their fuel resources.

PROJECT OVERVIEW

Our client needed a fuel management system that was both sophisticated and user-friendly. The solution was the G12 FES Tank paired with the SmartFill Gen 3 Fuel Management System, which comes equipped with WiFi functionality. This powerful combination offers a range of features designed to provide precise and comprehensive fuel management capabilities.

KEY PROJECT HIGHLIGHTS:

SmartFill Gen 3 Fuel Management System: At the heart of this setup is the SmartFill Gen 3, a robust system designed to make fuel management effortless and efficient. The WiFi functionality adds a layer of convenience and accessibility that transforms how our clients handle their fuel needs.

TRACK, MANAGE, COMPARE, AND ANALYSE FUEL USAGE: With SmartFill Gen 3, clients can monitor their fuel consumption with precision. The system allows for detailed tracking and analysis, ensuring that every drop of fuel is accounted for and optimised.

REAL-TIME TANK LEVEL MONITORING:Continuous feeds from the tank levels provide real-time updates, allowing clients to stay informed about their fuel status at all times. This feature is crucial for maintaining optimal fuel levels and preventing shortages.

DETAILED EXPENSE AND USAGE TRACKING: The system pinpoints fuel expenses and usage down to the individual user. This level of detail helps in identifying patterns, managing budgets, and ensuring accountability within the team.

REMOTE FUEL ACCESS MANAGEMENT: Clients can remotely manage who has access to the fuel, controlling dispensing to specific users. This feature enhances security and ensures that only authorised personnel can use the fuel.

REPORT GENERATION FOR TAX CREDITS: One of the significant advantages of the SmartFill Gen 3 is its ability to generate detailed reports. These reports are essential for claiming fuel tax credits for off-road or business-related fuel expenses, providing financial benefits to the clients.

DELIVERING VALUE BEYOND EXPECTATIONS

At Nqpetro, our goal is to deliver more than just a product; we aim to provide solutions that empower our clients. The G12 FES Tank with the SmartFill Gen 3 Fuel Management System is a prime example of how we combine technology and expertise to meet the specific needs of our clients.

Our team is dedicated to solving complex challenges and reaching even the most remote locations, ensuring that our clients receive the highest level of service and support. This project not only demonstrates our technical capabilities but also our commitment to innovation and excellence in the fuel services industry.

GET IN TOUCH

If you are looking for a similar fuel management system or have specific needs that require a customised solution, we invite you to reach out to our friendly and knowledgeable team. We are here to discuss your requirements and provide the best possible solution for your business.

At Nqpetro, we excel in tackling complex challenges and delivering top-notch solutions that drive success.

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100

Fuelling Defence in Shoalwater Bay

FUELLING DEFENCE IN SHOALWATER BAY

QUEENSLAND

KEY INFORMATION

CLIENT: AUSTRALIAN DEFENCE FORCE

LOCATION: SHOALWATER BAY, QLD

SERVICE: INSTALLATION OF REMOTE FILL CABINETS, PIPEWORK, VALVES, FITTINGS AND LABOUR

DURATION: 12 MONTHS

PROJECT MANAGER: CONOR NAPIORKOWSKI

PROJECT OVERVIEW

Exciting Update from Nqpetro!
We are pleased to announce the successful completion of the installation of remote fill point cabinets and fill pipework to two bulk Diesel tanks at Shoalwater Bay Defence site, in full compliance with AS4041 class 1 standards.

PROJECT DELIVERY

This project showcases our dedication to quality workmanship and adherence to industry standards. The attention to detail and commitment to excellence are evident in every aspect of the installation.
A big shoutout to the hardworking team at Nqpetro for their exceptional work on this project!

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100

Upgrade Complete: BP Stapylton’s Underground Petroleum Storage System Overhaul

BP STAPYLTON'S UNDERGROUND PETROLEUM STORAGE SYSTEM OVERHAUL

QUEENSLAND

KEY INFORMATION

CLIENT: BP STAPYLTON

LOCATION: STAPYLTON, QLD

SERVICE: REMOVAL AND REPLACEMENT OF THE ENTIRE UNDERGROUND PETROLEUM STORAGE SYSTEM (UPSS)

DURATION: 12 WEEKS 

PROJECT MANAGER: ADAM CHAMPION

PROJECT OVERVIEW

Nqpetro is proud to announce the successful conclusion of the BP Stapylton Tank Replacement project, which involved the removal and replacement of the service station’s underground petroleum storage system (UPSS), bringing the site in line with modern regulations. This comprehensive upgrade encompassed civil demolition works, decommissioning of existing fuel infrastructure, sheet piling, fuel tank installation, forecourt capture system installation, underground fuel pipework installation, hazardous area electrical upgrades, and fuel equipment supply, installation, and commissioning.

KEY PROJECT HIGHLIGHTS:

REMOVAL AND REPLACEMENT OF EXISTING UNDERGROUND TANKS: We successfully removed and replaced four existing double-wall fibreglass tanks, upgrading the underground petroleum storage system (UPSS) at the service station to enhance safety and efficiency.

SHEET PILING FOR TANK FARM: Implemented sheet piling techniques to secure and reinforce the tank farm area, ensuring stability and safety during construction activities.

INSTALLATION OF CAR AND TRUCK CANOPY PIPEWORK: Efficiently installed pipework for car and truck canopies, facilitating seamless fuel delivery and enhancing customer experience at the service station.

HAZARDOUS AREA ELECTRICAL UPGRADES: Performed hazardous area electrical upgrades to ensure compliance with safety standards and regulations, prioritising site personnel's and customers' well-being.

INTEGRATION WITH EXISTING INFRASTRUCTURE: Successfully integrated new fuel pipework within existing conduit systems mounted under a suspended concrete slab, optimising space utilisation and minimising disruption to site operations.

PROJECT DELIVERY

Nqpetro successfully navigated the challenges of the BP Stapylton Tank Replacement project, executing the removal and replacement of the entire UPSS with precision and expertise. From demolishing existing infrastructure to installing and commissioning modern equipment, our team ensured seamless integration and adherence to the highest standards. This comprehensive upgrade has modernised the service station, making it safer and more efficient for future operations.

Support and emergency call outs

Nqpetro provide a 24 hours call-out service, 365 days a year, for any system failure

EMERGENCY CALL OUTS

1800 451 770

During office hours call us on

07 4054 5100